Wetherbee Architects
Wetherbee Architects
  • HOME
  • WORK
  • ABOUT
  • EXPERIENCE
  • PRESS
  • CONTACT
  • More
    • HOME
    • WORK
    • ABOUT
    • EXPERIENCE
    • PRESS
    • CONTACT

  • HOME
  • WORK
  • ABOUT
  • EXPERIENCE
  • PRESS
  • CONTACT

EDGE TREATMENT: INDUSTRIALIZED WETLAND

This project is in response to the Combined Sewer Overflow (CSO) problem in NYC. When the city receives more than 1/10 an inch of rain over the course of one hour, all of the effluent goes directly out to the surrounding rivers via a series of outfall locations. The project develops  a new remediation landscape that can take in the wastewater at the outfall locations and purify it through a series of wetland systems. The municipal infrastructure provides an indoor greenhouse environment and an inhabitable roofscape.


The location of the pier is on axis with the CSO pipe located 5 feet below the ground. This new pier condition allows for people to be elevated above the bath house or enter the greenhouse through the incision in the wall.  The wall rises and lowers along the edge of Manhattan depending on the outfall location and the spans between.


The edge can be a place to go and receive fresh water. A public bath house facility is incorporated into the landscape and has its own water harvesting system that works in conjunction with the wetland system. Rainwater is harvested from the roof and directed into an activated wall, where it is cleansed through an Ultraviolet system. The wall wraps down beneath the pools, and provides lighting. 

Parsons Thesis

Spring 2007

    Copyright © 2026 Wetherbee Architecture. All Rights Reserved.


    Powered by